Prestbury Flood Aleviation Scheme
Working for Birse Civils, we completed a Flood Alleviation Scheme for the E.A at Prestbury. The Scheme involved the construction of 400linm of large diameter culvert including 7 reinforced concrete headwall structures and 2 large inlet structures. Other works include 400linm of open cut channel and outfall structures.
We created a digital terrain model for the channel, and completed the excavation and reinstatement works using our GPS controlled excavators.